|
The Infrastructure Conditions of Contract: Guidance Notes have been prepared to assist users of this Contract in the preparation of contract documents and the carrying out of contract works. They are comprehensive and explain the differences in the role of the Engineer in the Measurement Version and the role of the Employer's Representative in the Design and Construct Version.
Contents TEMPORARILY OUT OF STOCK
• Introduction
• Overall Concept
• Choice of design and Construct Contract
• Tendering Procedure
• Award of the Contract
• Operation of the Contract
• Employer's Representative
• Notes on Specific Clauses
|